萨克拉门托DPR施工办公室设计
vsszan1795070004171.jpg

SmithGroup has realized the office design for DPR Construction, a construction and engineering company, located in Sacramento, California.

SmithGroup and DPR have a long history of partnering to deliver successful NZE projects. When this opportunity presented itself, California’s stringent NZE requirements energized the team to push the boundaries with the design of this space. In addition to purchasing and renovating an existing structure – which previously served as a vehicle testing center and office—the team added a 5,692 SF addition of mass timber construction. In place of concrete or steel, load-bearing and structural elements were constructed from cross-laminated timber (CLT).

The facade of the building addition is open, transparent and urbane, melding with a resurgent Midtown Sacramento. Its most striking feature is a long central terrace with a solar canopy, accessible to all DPR employees. A variety of mature trees shield and shade the terrace emphasizing the design concept of the City of Trees. A new communicating stair was cut into the existing structure to create a new entry along vibrant J Street as a secondary entrance at the corner of J and 18th Streets which further activates the block. Operable windows and large sliding glass walls connect allowing the building to take advantage of Sacramento’s Delta Breeze. Solar Panels on the roof, over parking, and terrace canopy along with Solatubes on the new and existing roof and re-using the basement as a thermal labyrinth integrate renewable energy throughout the building. The office also features a battery back-up for a portion of the building’s electrical loads – ensuring its ability to withstand a prolonged power outage.

The interior configuration creates another advantage of wood construction, by reducing the need for interior finish materials like drywall. Occupants receive a better sense of the inner structural workings of the building, in addition to the warm and inviting properties of wood. The interior also features flexible spaces needed by a construction company – large meeting rooms, lots of huddle spaces and open collaboration areas. A seed wall creates a low water and energy solution rivaling a vertical garden. DPR and SmithGroup also selected seven local artists to design custom art installations in various mediums in the space.

A thread of excellence in adaptive reuse weaves its way through the entire project. This fruitful collaboration between SmithGroup and DPR produces a building that fulfills the “most sustainable building” dictum while exceeding California’s Net Zero Energy goals.

    • 9 张图片 | Pictures
    vsszan1795070004172.jpg
    vsszan1795070004173.jpg
    vsszan1795070004174.jpg
    vsszan1795070004175.jpg
    vsszan1795070004176.jpg
    vsszan1795070004177.jpg
    vsszan1795070004178.jpg
    vsszan1795070004179.jpg
    • 设计:SmithGroup
    • 客户:DPR Construction,
    • 面积:29,000 sqft
    • 年份:2019
    • 坐落:Sacramento, California, United States,
    • 行业:Construction / Engineering,
      AI文本分析中……
      AI色彩命名中……

      序赞Ai时刻等待着你的命令!~

      与Ai对话形式持续执行相关Ai智能体任务。

      暂时没有评论,你回一个呗!~

      您需要登录后才可以回帖 登录 | 注册序赞号

      快速回复 返回顶部 返回列表