美国休斯敦BG集团总部
Project Location: Houston, TX
Date Completed: February 2011
Owner: Hines
Architect: Kendall/Heaton Associates, Inc. and Pickard Chilton Architects, Inc. (Design)
Square Feet: 1,500,000
LEED: Platinum
Description:
The new 46-level tower is a cast-in-place high-rise office tower in Downtown Houston. 36-levels of office tower sit atop 10-levels of parking, two of which are below grade. The tower includes a curtainwall skin with horizontal sunshades and vertical fins. An outdoor sky garden is located on the 39th Level and is recessed into the building's structure. The project duration was four months of demolition followed by 33 months of construction.
Mainplace-2.jpg


Mainplace-3.jpg


Mainplace-4.jpg


Mainplace-9.jpg


Mainplace-10.jpg


Mainplace-11.jpg


Mainplace-12.jpg


Mainplace-13.jpg
Ai 分析中……

序赞Ai时刻等待着你的命令!~

与Ai对话形式持续执行相关Ai智能体任务。

wmq8882013-12-4 18:48:22
大堂空间设计手法很工整,材料特别
您需要登录后才可以回帖 登录 | 注册序赞号

快速回复 返回顶部 返回列表